Wednesday, 14 October 2009

filming.

We started our filming on monday as we had most of the props made. This went pretty well and i think we allowed ourself enough time to get everything filmed before we absolutely have to begin editing our footage. We've stuck mostly to what we planned on our storyboards, only making a few minor changes such as shooting from better angles. Although doing an animation is taking quite a while to film enough footage to fill 2 and a half minutes, we're uploading all of our footage to final cut after each shooting session, in order to check that we're happy with the results and don't need to re-do it. We was told today that we've got another week to shoot which should help us to get everything we planned to do done in time for the deadline. This weekend we'll be taking the camera home to film the only live footage in our video. Overall, everything is going well and to plan at the moment, we've just got to make sure we stay on schedule.

No response to “filming.”

Leave a reply

 
© 2009 GROUP 28 - Music Video 2009/10. All Rights Reserved | Powered by Blogger
Design by psdvibe | Bloggerized By LawnyDesignz